Main roof work over lounge
/ dining area erected.
Roof cast and finished over 3 bedroom wing.
Overall birds eye view of the main ground floor area
Re-enforced steelwork and hollow block roof constructed in just 2 days!!
Concrete poured on first roof over 3 bedroom wing
Electrical and data ductwork laid to go under slab
Great views from roof of 3 bedroom wing of villa
Roofs and ceilings started to be formed at just 8 weeks on site
Floor slabs laid with protective plastic and re-informed steel
Celebration on casting all concrete columns in under 7 weeks!!
Luckily the bricklayer is also a chef!!
All ground floor slabs now set for casting
Basement waterproofing and tanking started
Main drainage under slabs laid and set
All vertical columns now cast and erected
Columns on main lounge erected
Basement roof fully cast and set
Stairs to basement caged up
Roof and ceiling formed to the basement