Main roof work over lounge / dining area erected.
 
 

Roof cast and finished over 3 bedroom wing.
 
 

  Overall birds eye view of the main ground floor area
 

   Re-enforced steelwork and hollow block roof constructed in just 2 days!!
 
 

Concrete poured on first roof over 3 bedroom wing
 
 

Electrical and data ductwork laid to go under slab
 
 

  Great views from roof of 3 bedroom wing of villa
 
 

  Roofs and ceilings started to be formed at just 8 weeks on site
 
 

Floor slabs laid with protective plastic and re-informed steel
 
 

Celebration on casting all concrete columns in under 7 weeks!!
 



Luckily the bricklayer is also a chef!!
 
 

All ground floor slabs now set for casting
 

Basement waterproofing and tanking started
 

Main drainage under slabs laid and set
 


All vertical columns now cast and erected
Columns on main lounge erected
 
 
Basement roof fully cast and set
 
 

Stairs to basement caged up
 
 
Roof and ceiling formed to the basement