Monday, 21 January 2013
Preparing basement for structural roof
Bedroom suite stants to be erected
Vertical columns formed
Special blockwork delivered for structural rear retaining wall
Waterproof protection for rear retaining wall
Basement ready for roof
Concrete base poured and levelled
Stone laid and compacted ready for iron mesh and plastic
Basement completed, ready for base and roof
Concrete cube tested for quality and structure
Basement concrete walls poured and vibrated
Basement walls ready for concrete pour
Basement shuttering erected
Ironwork completed for basement footings
Vertical and horizantal tie bars installed for the basement footings
Capping and steelwork for basement started
Basement foundations dug out
Steel and ironwork installed ready for concrete footings
Capping Poured ready for iron work
Footings marked out for Bedroom wing